
Kleine Emme (LU)
Project Goal
Real-time continuous monitoring of bedload transport and critical discharge in the Kleine Emme river and main tributaries.
Solution
Deployment of a network of seismic and acoustic stations for the monitoring of bedload transport in the lower 25 km of the Kleine Emme watershed.
Client
Canton of Luzern
Project duration
2024-2028
Contact

FluvialTech GmbH
Bahnhaldenstrasse 5
CH – 8052 Zürich
info@fluvialtech.ch
Copyright © 2025 FluvialTech GmbH. All Rights Reserved.